CONCRETE DOOR FRAMES |
|||
|
System Components |
Initial Cost Structure |
||
|
|
|
||
|
Critical Factors 1. Curing
2.
Quality of sand for concrete |
Tools Used 1. Trowel 2. Wooden float 3. Straight float |
||
|
DO’S |
DON’T’S |
||
|
1. Frames should be cured for 14 days |
1. Cavities should not be left in the frame
during casting |
||
| Construction Process | |||
| Take measured quantities of cement, sand and aggregates and mix the concrete | Clean and assemble the mould | Place reinforcement in the mould and fill concrete | Insert a PVC pipe at the center of the post to fix door latch |
|
|
|
|
|
|
Compact the concrete with trowel to get uniform thickness to the frame |
Remove the mould |
Finish the edges with straight edge | Finish the edges with wooden float |
|
|
![]() |
|
![]() |
| Clean the concrete from the PVC pipe provided for the door latch | Make hole on the post to fix door hinges | Cure the frames for 14 days | Stack the frames |
|
|
![]() |
![]() |
![]() |
| Erect RCC door frames in the house | A house with a RCC door frame | A house with RCC door frame with wooden shutters | |
|
|
![]() |
![]() |
|