E-COURSE
ON
VULNERABILITY ATLAS
OF INDIA

  From the Desk of Executive Director

read more

  New Initiatives : Emerging Technologies
 
New… E-Learning Modules on the Technologies of LHPs for TECHNOGRAHIs New...Release of Publications on the occasion of World Habitat Day 2023
 

CONCRETE DOOR FRAMES
 
System Components
 
Initial Cost Structure
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Critical Factors
 
1. Curing
2. Quality of sand for concrete
3. Provision of holes at the right place for
    fixing door shutters
4. Holes for fixing the door shutter
 
Tools Used
 
1.   Trowel
2.   Wooden float
3.   Straight float
 
DO’S
DON’T’S
1. Frames should be cured for 14 days
2. Mortar should be used within 30
    minutes of adding water to mix
3. Frames should be stacked properly
 
1. Cavities should not be left in the frame
    during casting
2. Fine sand should not be used
3. Excess water should not be added to
    the concrete
 
                                                   Construction Process           
Take measured quantities of cement, sand and aggregates and mix the concrete
Clean and assemble the mould
Place reinforcement in the mould and fill concrete
Insert a PVC pipe at the center of the post to fix door latch
 
 
 
 
 
 
 
 
 
Compact the concrete with trowel to get uniform thickness to the frame
Remove the mould
 
Finish the edges with straight edge
Finish the edges with wooden float

     
Clean the concrete from the PVC pipe provided for the door latch
Make hole on the post to fix door hinges
Cure the frames for 14 days
 Stack the frames

 

   
 
Erect RCC door frames in the house
A house with a RCC door frame
A house with RCC door frame with wooden shutters
 
 
 
 
 

 
Creating Enabling Environment for Affordable Housing for All…… since 1990
 
Home l BMTPC mail l Feedback l Site Map
Designed & developed by: Hollywood Multimedia Ltd. All rights reserved by: BMTPC